Cogeneration power plant in Kaunas

Object built in 2019 using  Tenax W 240 MW T2 with PVDF metal coating and 0.6mm thick metal, providing A + energy efficiency building requirements.

Total area covered with sandwichpanels – 15000 m2

Source: https://kkj.lt/

Used products